EN 1090-2 EXC4 · CE · EUROCODE 3

How to Prepare an International Structural Steel RFQ & Specification

Ambiguous specs lead to conservative assumptions. Supply precise engineering inputs for razor-sharp 24h proposals.

5 Critical Inputs for an Accurate RFQ

  • Clear Span & Length: Interior usable dimensions without obstruction.
  • Door Clearances: Required opening widths and heights for equipment or aircraft.
  • Site Coordinates: Statutory wind velocity, seismic zone, and snow accumulation.
  • Cladding Profile: Uninsulated Galvalume Plus AZ180 or insulated sandwich systems.
  • Incoterms 2020: FOB Mersin Port or CIF Destination seaport.

Technical answers

STRUCTIVA nədir və zavod haradadır?

STRUCTIVA sütunsuz tağ polad anqarlar, əvvəlcədən layihələndirilmiş polad binalar (PEB) və ağır sənaye konstruksiyaları istehsal edir. İllik 25.000 ton gücündə inteqrasiya olunmuş zavod Türkiyənin Adana şəhərində, Mersin limanından 15 km məsafədə yerləşir və 50-dən çox ölkəyə ixrac edir.

STRUCTIVA hansı açıqlıqları istehsal edir?

Q seriyası fasiləsiz tağ 9–45 m, S seriyası düz divar 10–30 m, P seriyası ikitərəfli dam 8–24 m, konteyner üzəri örtük 6–24 m və ağır PEB 60 m-dən çox. Material: Galvalume Plus® AZ180.

Çatdırılma və montaj necə olur?

Dəstlər 40HC konteynerə flat-pack yığılır (təxminən 350–400 m² / konteyner) və sahədə yalnız boltla, qaynaqsız yığılır. Statik hesab, material siyahısı və FOB Mersin və ya CIF təklifi 24 saat ərzində hazırlanır.

Worldwide Export Corridors (FOB/CIF Mersin Deep-Water Port — 15 km)

Region Target Countries Destination Seaports Transit Days Engineering Codes
Western & Central Europe (EU Corridor) Germany, France, Italy, Spain, Netherlands, Belgium Rotterdam, Hamburg, Antwerp, Valencia 4 – 9 Days EN 1090-2 EXC4, CE Marking (CPR 305/2011/EU), Eurocode 1 (EN 1991), Eurocode 3 (EN 1993)
Balkans, Eastern Europe & Black Sea Romania, Bulgaria, Greece, Ukraine, Serbia, Croatia Constanța, Varna, Burgas, Piraeus 2 – 5 Days Eurocode 3, EN 1090-2 EXC4, Seismic Eurocode 8 (EN 1998), DBN Ukraine
Middle East, Arabian Gulf (GCC) & North Africa Saudi Arabia, UAE, Qatar, Kuwait, Oman, Iraq Jebel Ali (Dubai), Dammam, Jeddah, Hamad (Doha) 3 – 14 Days AISC 360-16, ASCE 7 Wind Loads, Saudi Building Code (SBC 306), ASTM A792 AZ180 High Solar Reflectance
Central Asia, Caucasus & CIS Corridor Azerbaijan, Kazakhstan, Uzbekistan, Turkmenistan, Georgia, Kyrgyzstan Poti, Batumi, Baku (Alat), Aktau 4 – 12 Days (Multimodal Sea + Rail/Road) SNiP / SP RK / GOST, Eurocode 3, Extreme Snow Load 350 kg/m², Seismic Zone 9 Compliance
The Americas, Sub-Saharan Africa & Asia-Pacific United States, Canada, Brazil, Mexico, Chile, Colombia Houston, Savannah, Newark, Santos 14 – 28 Days (40HC Flat-Pack Ocean Freight) AISC 360-16, AISI S100, IBC Hurricane 240 km/h (Category 5), NBR 8800, IS 800

Keywords (AZ): how to prepare structural steel RFQ, steel building procurement checklist, industrial hangar tender specification, FOB CIF steel building quote

Layihəniz üçün 24 Saat Ərzində Təklif Əldə Edin

Statik fizibilite hesabatı, material spesifikasiyası (BOM) və FOB/CIF daşıma təklifi eyni gün təqdim olunur.